Skip to content

What facilities at the new Fastned Oxford EV charging hub?

What facilities at the new Fastned Oxford EV charging hub?

Video by Go Green Autos via YouTube
Source
What facilities at the new Fastned Oxford EV charging hub?

In this video I visit the new EV charging hub in Oxford, which is located within the Redbridge Park & Ride car park. In the original plan, a cafe was to be built. I’m not sure if this is still on the cards for a future date, but when recorded in July 2022, no new facilities exists for the charging hub. In this video I show you what is available for EV drivers while charging their vehicle.

To see my original walk around video of the Fastnet Oxford EV charging hub, go to https://youtu.be/NzzxkP-hfCA
To find out more about the Oxford SuperHub, see https://energysuperhuboxford.org/ and https://www.pivot-power.co.uk/our-projects/cowley/

For some background information on this new charging hub…
Opened in July 2022, the charging hub will initially offer fast and ultra-rapid charging for 42 vehicles at once at Oxford’s Redbridge Park and Ride.
It will be powered entirely by renewable energy.
With 10 MW of installed capacity on site, the hub can scale up with EV adoption to provide charging for 400 vehicles.
Fastned has initially installed ten charging bays at the Superhub with 300 kW of power available, capable of adding 300 miles of range in just 20 minutes for hundreds of EVs per day.
Unlike any other UK charging hub, the site is directly connected to National Grid’s high voltage transmission network via a four-mile underground cable, which will deliver 10 MW of power to quickly and simultaneously charge hundreds of EVs without putting additional strain on the local electricity network or requiring costly upgrades.

For EVs for sale, see https://www.gogreenautos.co.uk/for-sale
To look at the back catalogue of EV videos on this channel, see https://www.youtube.com/c/GoGreenAutos/videos
Why not follow Go Green Autos on Facebook at https://www.facebook.com/GoGreenAutos ?

Go to Source