Skip to content

ElecTrek E15 20230226 155910 018 HalfHourDriving TestingAccessoryMotor

ElecTrek E15 20230226 155910 018 HalfHourDriving TestingAccessoryMotor

Video by Lightning Ryan Fulcher via YouTube
Source

20230211 Elec-Trak E15 Work Session One
: Who: Jay Donnaway (SeattleEVA.org President) and Lightning Ryan Fulcher (In plaid jacket)
* This machine was originally restored in 2011 by Gary per: https://www.builditsolar.com/Projects/Vehicles/E15ElecTrak/Main.htm
* 04:15 https://youtu.be/NpdyS0HJIXE ElecTrak E15 20230211 132246 003 E20 Needs TLC
** Do Not Panic!! This E20 IS NOT the one we are fixing up for you!
* 04:31 https://youtu.be/nzEbUiYVvEE ElecTrak E15 20230211 143250 004 Pulling Dead Lithium
** These are a pair of full 36v Lithium packs, both very dead, being removed
* 25:01 https://youtu.be/uXzt2flu5WQ ElecTrak E15 20230211 153121 006 Start New Control Solder
** This is the SepEx Field Weakening speed control board being replaced.
** The throttle seems to have three speeds which engage these resisters to weaken
**: The separately excited field windings, which increases the power/speed.
*** https://freerangeelectric.com/index.php?main_page=product_info&cPath=1_8_17&products_id=145
*** https://freerangeelectric.com/index.php?main_page=product_info&cPath=1_8_17&products_id=63 The part we speculated about that was missing from old burnt out board a "Replacement varistor. ROHS Compliant"
** The highest speed also engages the "toaster" nichrome at front of hood, I think
* 29:01 https://youtu.be/2wL0MAaGl_w ElecTrak E15 20230211 161950 007 Test Bat First Run
** Installing a temporary LiFePO4 Jag35 50Am 12v*3series pack and initial drive
*** https://jag35.com/products/slm12-lifepo4-12v-50a-4s-battery $99 need three(3)
* 27:35 https://youtu.be/vNMFjt7yM0Y ElecTrak E15 20230211 164906 008 First Drive Resistor checking
** Tooling around the yard and hand testing on the new board resistors heating up.
** We sure could have used a "Shift Pattern Decal" https://freerangeelectric.com/index.php?main_page=product_info&cPath=1_8_17&products_id=137
* 13:03 https://youtu.be/JmyDpRUx7SA ElecTrak E15 20230211 171822 009 Accessories
** Checking out the Accessories: Mower Deck, Rear Lift, Snow Blade, Tiller(Yet to acquire)
* 05:09 https://youtu.be/YM6QkD5s9zQ ElecTrak E15 20230211 173423 010 Mower Deck testing
** Spinning up the mower deck
* 02:32 https://youtu.be/zasatftyNXk ElecTrak E15 20230211 173940 011 Parked until next time
** Parking in shed until next work session

—-
20230226 Elec-Trak E15 Work Session Two
: Who: Jay Donnaway (SeattleEVA.org President) and Lightning Ryan Fulcher (In plaid jacket)
* This machine was originally restored in 2011 by Gary per: https://www.builditsolar.com/Projects/Vehicles/E15ElecTrak/Main.htm
* 38:37 https://youtu.be/YWcgz8Cot5U ElecTrak E15 20230226 164052 016 RestoreRearAccessoryMountCompatibility
** Rear Steel Battery Box has an aftermarket 1/2" plywood box built outside the original.
*** This wood box is covering the rear stabber slots that accessories use to mount.
*** We cut out just enough of the wood box material so to regain access to the rear stabber slots.
*** The rear winch lift now fits, although it does not completely seat over the rear bumper and pin into place.
*** Will need to devise a new pinning mechanism. A pair of small C-Clamps for example under the bumper could do the trick.
**** Or it should be possible to also remove more wood box so to expose the rear bumper, but pinning would still be obstructed.
**** OR! There is a hitch with a center pin that probably lines up with the accessory winch, how about using that, DOHH.
* 52:31 https://youtu.be/oVnkVPuvTEE ElecTrak E15 20230226 155910 018 HalfHourDriving TestingAccessoryMotor
** Began @8:55-27:30 (maybe 25% driving) ##18.5 *.25 ==4.6minutes
** Continuous Driving @27:30-29:01 ~~1.5min
** Continuous Driving Pt2@0:00-8:30 (Check toaster heat) ~~8.5min
** Testing an accessory motor @9:45-13:00
** Continuous Driving @13:00-14:35 (Check Traction Motor Heat) ~~1.5min
** Parking Driving @19:10-19:55 ~~0.75min
** 4.6+1.5+8.5+1.5+0.75 ~~==32.95min (33minutes) Lets just call it 30minutes.
*** Were Recharged at 10a in 2:13:01 adding 10.7Ah, Ending deltaV was 63mv.
*** This means we averaged ~21.4Amps of draw for the half hour of runtime.
*** At @42v(899Watts) resting or @38v(813Watts) under load.
*** Or Consumed 10.7Ah @42v(450Wh) or @38v(406Wh) consumed over the half hour.
*** Total Capacity of these LiFePO4 are 50Ah @42(2100Wh) we used about ~20% which is 420Wh checks out.
* So we can project that if running an accessory doubles the load, about 1 full hour of runtime as is.
** Am very much considering doubling the pack size and moving to beefier connections and copper for next time.

Go to Source