Skip to content

ElecTrak E15 20230211 173940 011 Parked until next time

ElecTrak E15 20230211 173940 011 Parked until next time

Video by Lightning Ryan Fulcher via YouTube
Source
ElecTrak E15 20230211 173940 011 Parked until next time

20230211 Elec-Trak E15 Work Session One
: Who: Jay Donnaway (SeattleEVA.org President) and Lightning Ryan Fulcher (In plaid jacket)
* This machine was originally restored in 2011 by Gary per: https://www.builditsolar.com/Projects/Vehicles/E15ElecTrak/Main.htm
* 04:15 https://youtu.be/NpdyS0HJIXE ElecTrak E15 20230211 132246 003 E20 Needs TLC
** Do Not Panic!! This E20 IS NOT the one we are fixing up for you!
* 04:31 https://youtu.be/nzEbUiYVvEE ElecTrak E15 20230211 143250 004 Pulling Dead Lithium
** These are a pair of full 36v Lithium packs, both very dead, being removed
* 25:01 https://youtu.be/uXzt2flu5WQ ElecTrak E15 20230211 153121 006 Start New Control Solder
** This is the SepEx Field Weakening speed control board being replaced.
** The throttle seems to have three speeds which engage these resisters to weaken
**: The separately excited field windings, which increases the power/speed.
*** https://freerangeelectric.com/index.php?main_page=product_info&cPath=1_8_17&products_id=145
*** https://freerangeelectric.com/index.php?main_page=product_info&cPath=1_8_17&products_id=63 The part we speculated about that was missing from old burnt out board a "Replacement varistor. ROHS Compliant"
** The highest speed also engages the "toaster" nichrome at front of hood, I think
* 29:01 https://youtu.be/2wL0MAaGl_w ElecTrak E15 20230211 161950 007 Test Bat First Run
** Installing a temporary LiFePO4 Jag35 50Am 12v*3series pack and initial drive
*** https://jag35.com/products/slm12-lifepo4-12v-50a-4s-battery $99 need three(3)
* 27:35 https://youtu.be/vNMFjt7yM0Y ElecTrak E15 20230211 164906 008 First Drive Resistor checking
** Tooling around the yard and hand testing on the new board resistors heating up.
** We sure could have used a "Shift Pattern Decal" https://freerangeelectric.com/index.php?main_page=product_info&cPath=1_8_17&products_id=137
* 13:03 https://youtu.be/JmyDpRUx7SA ElecTrak E15 20230211 171822 009 Accessories
** Checking out the Accessories: Mower Deck, Rear Lift, Snow Blade, Tiller(Yet to acquire)
* 05:09 https://youtu.be/YM6QkD5s9zQ ElecTrak E15 20230211 173423 010 Mower Deck testing
** Spinning up the mower deck
* 02:32 https://youtu.be/zasatftyNXk ElecTrak E15 20230211 173940 011 Parked until next time
** Parking in shed until next work session

—-
20230226 Elec-Trak E15 Work Session Two
: Who: Jay Donnaway (SeattleEVA.org President) and Lightning Ryan Fulcher (In plaid jacket)
* This machine was originally restored in 2011 by Gary per: https://www.builditsolar.com/Projects/Vehicles/E15ElecTrak/Main.htm
* 38:37 https://youtu.be/YWcgz8Cot5U ElecTrak E15 20230226 164052 016 RestoreRearAccessoryMountCompatibility
** Rear Steel Battery Box has an aftermarket 1/2" plywood box built outside the original.
*** This wood box is covering the rear stabber slots that accessories use to mount.
*** We cut out just enough of the wood box material so to regain access to the rear stabber slots.
*** The rear winch lift now fits, although it does not completely seat over the rear bumper and pin into place.
*** Will need to devise a new pinning mechanism. A pair of small C-Clamps for example under the bumper could do the trick.
**** Or it should be possible to also remove more wood box so to expose the rear bumper, but pinning would still be obstructed.
**** OR! There is a hitch with a center pin that probably lines up with the accessory winch, how about using that, DOHH.
* 52:31 https://youtu.be/oVnkVPuvTEE ElecTrak E15 20230226 155910 018 HalfHourDriving TestingAccessoryMotor
** Began @8:55-27:30 (maybe 25% driving) ##18.5 *.25 ==4.6minutes
** Continuous Driving @27:30-29:01 ~~1.5min
** Continuous Driving Pt2@0:00-8:30 (Check toaster heat) ~~8.5min
** Testing an accessory motor @9:45-13:00
** Continuous Driving @13:00-14:35 (Check Traction Motor Heat) ~~1.5min
** Parking Driving @19:10-19:55 ~~0.75min
** 4.6+1.5+8.5+1.5+0.75 ~~==32.95min (33minutes) Lets just call it 30minutes.
*** Were Recharged at 10a in 2:13:01 adding 10.7Ah, Ending deltaV was 63mv.
*** This means we averaged ~21.4Amps of draw for the half hour of runtime.
*** At @42v(899Watts) resting or @38v(813Watts) under load.
*** Or Consumed 10.7Ah @42v(450Wh) or @38v(406Wh) consumed over the half hour.
*** Total Capacity of these LiFePO4 are 50Ah @42(2100Wh) we used about ~20% which is 420Wh checks out.
* So we can project that if running an accessory doubles the load, about 1 full hour of runtime as is.
** Am very much considering doubling the pack size and moving to beefier connections and copper for next time.

Go to Source